Visit €0 · quote €0 · the price per m² before the scaffolding goes up

Jobs on the books

material, duration, town, year

Roof renewed, dormer restored

A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.

Interlocking clay tiles

2025
Rezé
12 days

Natural slate, three dormers

A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.

Natural slate, hooked

2025
Orvault
4 weeks

Standing-seam zinc roof

A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.

Natural zinc

2024
Nantes
9 days

Three roof windows for a loft conversion

A dark loft turned into two bedrooms, three windows cut into the tiled slope.

Roof windows and flashing kits

2025
Carquefou
3 days

Rafters replaced before re-roofing

Rotten rafters found when stripping the roof, replaced before the new covering went on.

Treated softwood

2024
Vertou
6 days

Canal tiles re-laid on a stone house

Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.

Reclaimed canal tiles

2024
Saint-Sébastien-sur-Loire
8 days

Notes

Before you sign anything for your roof

1

Changing how the roof looks

A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.

2

Ten-year cover

For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.

3

Insulation grants

Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.

4

After a storm

Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.

5

Natural disaster status

It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.

6

Door-to-door offers

We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.

Where the free visit applies

and how soon we come

Carquefou

44470

within 48 h

La Chapelle-sur-Erdre

44240

within 48 h

Nantes

44000

within 24 h

Orvault

44700

within 48 h

Rezé

44400

within 24 h

Saint-Herblain

44800

within 24 h

Saint-Sébastien-sur-Loire

44230

within 24 h

Vertou

44120

within 48 h

Free, no obligation

Get your exact figure

The type of roof and an approximate area let us bring the right figures to the visit. Leave them blank if you do not know.

Rather talk? Call01 23 45 67 89

Rate card No. 1, roofing

The price per square metre, before the scaffolding goes up.

Every service on this site has a printed starting price. After the visit you get the exact figure, line by line, and it is the one on the invoice.

Fig. 1: flat tiles on new battens, the part of the price you never see

Tile roof renewal

per m², from

€120

Natural slate

per m², from

€160

Zinc gutters

per metre, from

€55

How a roofing price is built

four lines, nothing hidden

1

Area

Measured on the roof, never guessed from the ground. The number of m² is written on the quote.

2

Materials

Named with their brand, model and origin, so you can compare two quotes like for like.

3

Scaffolding

A line of its own, priced by the week. It is often what makes two quotes differ.

4

Waste removal

Old tiles and offcuts taken to the approved centre, the removal written on the quote.

If we find rotten battens or rafters once the roof is open, we stop, show you the photos and price the extra before touching anything. You can say no: the initial price still stands for the initial job.

Letters from customers

Invoices we are told about

"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M., Leak repair, Orvault
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V., Slate roof renewal, Carquefou
"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L., Storm tarping, Rezé